PROJECTS
Waste Management
Project Size: 25,000 sq. ft.
Services: Diamond grind and polish concrete.
Amazon, Chatsworth
Project Size: 120,000 sq. ft.
Services: Remove epoxy underlayment...
Services: Shotblast and diamond grind edges. Install EBA epoxy with sand broadcast. Pour Mapei underlayment material from 3/8" to 1 1/2" in thickness. Install Key Resin epoxy floor system.
Sony Pictures, Culver City
Project Size: 15,000 sq. ft.
Services: Diamond grind concrete with 2 steps of diamonds...
Services:
Diamond grind concrete with 2 steps of diamonds. Patch holes. Seal with an acrylic sealer.
Armstrong Garden Centers
Project Size: 5,000 sq. ft.
Services: Remove existing VCT, diamond grind concrete with 2 steps of diamonds...
Services:
Remove existing VCT, diamond grind concrete with 2 steps of diamonds, stain concrete and seal with an acrylic sealer.
Red Digital
Project Size: 70,000 sq. ft.
Services: PROJECT 1- Shotblast concrete in preparation for installation of moisture system...
Services:
PROJECT 1- Shotblast concrete in preparation for installation of moisture system. Install Mapei moisture reduction barrier. Prime substrate and pour Mapei underlayment material
PROJECT 2- Diamond grind and polish warehouse concrete floor.
LAX Parking Deck
Project Size: 448,000 sq. ft.
Services: Shotblast concrete and diamond grind edges in preparation for the...
Services:
Shotblast concrete and diamond grind edges in preparation for the new coating system.
LuLaRoe, Corona
Project Size: 4,000 sq. ft.
Services: Diamond Grind & Seal concrete
Services:
Diamond Grind & Seal concrete
TMZ
Project Size: 30,000 sq. ft.
Services: Diamond grind concrete with 2 steps of diamonds...
Services:
Diamond grind concrete with 2 steps of diamonds. Patch holes. Seal with an acrylic sealer.
Sacramento Kings
Project Size: 17,900 sq. ft.
Services: Scarify various high spots down in concrete...
Services:
Scarify various high spots down in concrete. Shotblast concrete in preparation for underlayment material. Prime substrate and pour 1 1/4" average of Mapei underlayment material prior to Sports Court installation.
Netflix
Project 1 Size: 68,000 sq. ft.
Project 2 Size: 4,400 sq. ft.
Services: PROJECT 1- Diamond grind concrete...
Services:
PROJECT 1- Diamond grind concrete with 2 steps of diamonds. Patch holes. Seal with an acrylic sealer.
PROJECT 2- Installed a Dex-O-Tex Urethane Cement system in the Kitchen Area.
Temecula Valley USD
Project Size: 55,306 sq. ft.
Services: Diamond grind and polish concrete to an 800 finish...
Services:
Diamond grind and polish concrete to an 800 finish. Install Polyurea in all joints. Densified, sealed, and burnished.
Kaiser Permanente
Project Size: 3,200 sq. ft.
Services: Prep concrete, install mortar sloping material to drains...
Services:
Prep concrete, install mortar sloping material to drains. Install Dur-A-Flex Accelera system with cove base.
Northgate Market
Project Size: 700 sq. ft.
Services: Install Epoxy floors in Kitchen Area.
Services:
Install Epoxy floors in Kitchen Area.
CSULB, The Pyramid
Project Size: 38,000 sq. ft.
Services: Shotblast concrete and diamond grind edges in preparation...
Services:
Shotblast concrete and diamond grind edges in preparation for the Sports Floor system.
Prime substrate and pour self-leveling underlayment to provide for a flat and smooth floor.
Superior Market Los Angeles
Project Size: 14,000 sq. ft.
Services: Diamond Grind & Seal concrete.
Services:
Diamond Grind & Seal concrete.
Pasadena City College
Project Size: 6,000 sq. ft.
Services: Scarify concrete down at various high spots...
Services:
Scarify concrete down at various high spots.
Shotblast concrete and diamond grind edges in preparation for topping material. Install Ardex EP2000 and sand broadcast for primer system. Pour Ardex K-521 topping material and seal.